Upload your drawings. Takeoff gathers and prices your full bill of quantities in minutes, not days, complete with live supplier pricing and fully costed labour.




Upload your drawings and Takeoff measures, counts, and itemises every material into a structured bill of quantities. No scale rule, no spreadsheets, no manual takeoff.
Every BOQ line matched against live supplier catalogues. Real prices, real stock levels, refreshed the moment the market moves, so your estimate never goes stale.
Productivity rates applied to every task. Crew sizes, hours on site, and labour rates calculated line by line, so you know the true cost of the build, not just the materials.
Upload the full drawing pack: GA plans, elevations, schedules, the lot. Takeoff classifies every sheet, spots superseded revisions, and starts extracting quantities the moment they land.
Click to upload or drag and drop
PDF drawing packs, full sets welcome
Minutes later you have a measured bill of quantities, structured to NRM2: item codes, descriptions, quantities and units. Every line carries a confidence flag and traces back to the sheet it came from.
| ⬤ | Code | Description | Qty | Unit | Sheets |
|---|---|---|---|---|---|
| 14 · Masonry | |||||
| 🟢 | 14.1.1 | Facing brickwork, 102.5mm, gauged mortar (1:1:6) | 186 | m² | A-201, A-202 |
| 🟢 | 14.1.2 | Blockwork inner leaf, 100mm dense concrete block | 174 | m² | A-201 |
| 🟡 | 14.2.1 | Damp proof course, pitch polymer, 225mm wide | 64 | m | A-105 |
| 🟢 | 14.3.1 | Prestressed concrete lintels, 1200mm | 18 | nr | A-301 |
| 🔴 | 14.4.1 | Movement joints, incl. filler & sealant | 22 | m | A-201 |
Every row is priced against live merchant catalogues: Travis Perkins, Toolstation, Screwfix and Kellaway. AI assigns trades and output rates for labour, and subcontractor quotes drop in as fixed lines. One rollup: materials, labour, subcontract.
| Description | Materials | Labour |
|---|---|---|
| Facing brickwork, 102.5mm | £6,882.00Travis Perkins · 11,160 bricks | Labour£4,092.00Bricklayer · 0.55 hr/m² |
| Blockwork inner leaf, 100mm | £4,258.60Toolstation · 1,740 blocks | Labour£2,610.00Bricklayer · 0.5 hr/m² |
| Damp proof course, 225mm | Manual£380.00Quote · allowance | Labour£288.00Bricklayer · 0.15 hr/m |
| Scaffolding · Apex Access | Subcontract£8,450.00on site 14 Aug 2026 | n/a |
Door, window, finish and services schedules come straight off the BOQ, one row per door, to UK conventions: fire ratings, leaf sizes, doorset types, every row traced back to its drawing. Export any of them as PDF or Excel.
| ⬤ | Ref | Doorset | Location | Leaf (mm) | Fire | Drawings |
|---|---|---|---|---|---|---|
| 🟢 | D-G01 | DS-01 | Corridor G.02 → Office G.05 | 838 × 1981 | FD30S | A-101 |
| 🟢 | D-G02 | DS-01 | Corridor G.02 → Meeting G.06 | 838 × 1981 | FD30S | A-101 |
| 🟢 | D-G03 | DS-02 | Lobby G.01 → Stair core | 926 × 2040 | FD60S | A-101, A-401 |
| 🟡 | D-101 | DS-03 | Landing 1.01 → Office 1.02 | 838 × 1981 | FD30 | A-102 |
| 🔴 | D-B01 | DS-05 | Plant B.01 → Corridor B.02 | 838 × 1981 | FD60 | A-100 |
The priced BOQ becomes a working programme. Activities cascade from their dependencies, weekends and bank holidays are skipped automatically, and subcontractor deliveries land as milestones on the chart.
Working days only. Weekends and UK bank holidays are skipped automatically. Dates cascade from dependencies.
Real packs arrive messy: three revisions of the same plan, planning drawings mixed in with construction issues, a schedule that disagrees with the plan. Takeoff resolves the set before it measures anything, then shows you exactly which sheets fed the BOQ and which it held back, with the reason for each.
Quantity sources (4)
Excluded (3)
Superseded by A-101 Rev C03.
Planning-stage issue. Read for context, not measured.
3D view. Non-quantitative.
Doors · ground floor
Door count differs between the GA plan and the door schedule.
Kept 18 nr from A-101 Rev C03 · plan is the master for door counts
Rejected 17 nr (Door Schedule Rev A) · not summed
The same downlight appears on the ceiling plan, the GA plan and the services layout. Measure sheet by sheet and you bill it three times. Takeoff names one master sheet per element: ceiling fittings are counted off the RCP, sockets off the GA plan, rooflights off the roof plan. Every other sighting corroborates the number and lifts its confidence. None of them add to it.
You are the one who signs the tender, so nothing is a black box. Every line carries the sheet it came from, how it was measured, its NRM2 and Uniclass codes, and an honest confidence flag. Labour shows the arithmetic in full. Check any figure in seconds, and change it if you disagree.
Gather the BOQ, price it live, cost the labour, and plan the programme, all from one set of drawings.